Our Projects
FOAM REMOVAL
Removed 45,000sqm of foam and replaced with standard waterproofing.
Category: Waterproofing
SOLAR INSTALLATION
Installed 300KW On-Grid system and commissioned the system.
Category: Solar Installation
FACADE LIGHTING
Installed Facade Lighting at Aziz Avenue 1,2 &3.
Category: Facade Lighting
HIGH-BAY LIGHTS
Installed 200 High-bay lights at the archeological sights in Sharjah.
Category: Lighting
WATERPROOFING
Description for Project 5. Waterproofed 43,00sqm of metal roof with our EPDM membrane and Bond adhesive
Category: Waterproofing
HILTON HOTEL
Installed facade lighting, Bollard lights and In-ground lights.
Category: Electrical
STANDARD CARPETS
Installed and waterproofed on-roof and side-roof electric ventilation systems.
Category: Electrical